Showing posts with label TPPM. Show all posts
Showing posts with label TPPM. Show all posts

Wednesday, June 30, 2010

What-is-testing-process-performance-model-or-TPPM?

Testing Process Performance Model


Testing Process Performance model is to predict the important attributes of testing process and monitor the efficiency and performance of testing process by tracking and analyzing the actual data.

What-is-Testing-Process-Performance-Model-(TPPM)-activity?

Testing PPM activity

Testing PPM activity can be logically divided into following Sub-Activities.

  • Estimations-here estimations are done
  • Actual Measurement Entry - here we come with actual measures
  • Statistical Analysis - we are doing analysis for the estimations and measure in this activity

What-is-the-sequence-of-testing-process-performance-model-TPPM?

Sequence of TPPM


  • Testing Process Performance model is prepared for each Release testing activity of Project/Product .
  • After test designing of each release, TPPM estimation is completed.
  • While  test execution, TPPM is updated on daily basis or after some defined interval based on release test execution time.

How-estimation-in-TPPM-(-testing-process-performance-model- activity?

In testing PPM first of all estimate following things step by step


  • Size of each Test Case (over all size and lenght of the every  test case is estimated)
  • Defects of each Test Case(defects of the test cases are estimated)
  • Efforts to execute each test case (Efforts are also are part of the estimates)

Monday, June 15, 2009

How-estimation-in-TPPM-(-testing-process-performance-model- activity?

In testing PPM first of all estimate following things step by step


  • Size of each Test Case (over all size and lenght of the every  test case is estimated)
  • Defects of each Test Case(defects of the test cases are estimated)
  • Efforts to execute each test case (Efforts are also are part of the estimates)

What-is-Testing-Process-Performance-Model-(TPPM)-activity?

Testing PPM activity

Testing PPM activity can be logically divided into following Sub-Activities.

  • Estimations-here estimations are done
  • Actual Measurement Entry - here we come with actual measures
  • Statistical Analysis - we are doing analysis for the estimations and measure in this activity

What-is-the-sequence-of-testing-process-performance-model-TPPM?

Sequence of TPPM


  • Testing Process Performance model is prepared for each Release testing activity of Project/Product .
  • After test designing of each release, TPPM estimation is completed.
  • While  test execution, TPPM is updated on daily basis or after some defined interval based on release test execution time.

What-is-testing-process-performance-model-or-TPPM?

Testing Process Performance Model


Testing Process Performance model is to predict the important attributes of testing process and monitor the efficiency and performance of testing process by tracking and analyzing the actual data.