Showing posts with label test. Show all posts
Showing posts with label test. Show all posts

Sunday, June 14, 2009

What are the main steps of metric and measurement?

Here are the main steps.

  • Derive the software measures and metrics that are appropriate for the representation of software.
  • Data required to derive the formulated metrics are collected.
  • Once computed, appropriate metrics are analyzed on pre-established guidelines and past data.
  • The results of the analysis are interpreted to gain insight into the quality of the software, and the results of the interpretation lead to modification of work products arising out of analysis, design, code, or test.

Thursday, April 16, 2009

What are environmental needs in a test plan?

Environmental needs
Environmental needs include hardware, software, data, interfaces and other requirements that pertain to the testing effort.

What is test deliverables in test plan?

Test Deliverables
This is a listing of all the documents, tools and other components that to be developed and maintained in support of the testing effort.

What is suspension criteria and resumption requirements in test plan?

suspension criteria and resumption requirements
The purpose of this section of the test plan is to identify any conditions that warrant a temporary suspension of testing and the criteria for resumption.